Dawson City, Yukon · 10-day owner/operator intensive Founding cohort applications · nicholasgust@gmail.com

Curriculum

Placer mining curriculum: five modules, ten days.

Five modules. Ten days. One integrated operating system. Every block ends with a decision you can defend in the field or in a seasonal plan.

Recovery plant on a placer mine
Each module ends with a decision you can defend on operating ground.
DaysModuleFocusYou leave with
1–2Read the groundPlacer systems, exploration design, samplingExploration program and sample chain
3–4Design the minePay boundaries, sequencing, layoutMine layout audit and sequence
5–6Water and recoveryWater balance, wash plants, gold lossWater checklist and recovery test plan
7–8Keep it compliantFleet, maintenance, inspections, reclamationMaintenance dashboard and compliance calendar
9–10Run the businessCosts, cash flow, simulationSeasonal budget and 90-day action plan

Days 1–2

Read the ground

Build a defensible exploration program, lay out test lines, log results, and understand how uncertainty moves into a seasonal plan.

Days 3–4

Design the mine

Choose a cut, defend a sequence, and audit roads, ponds, stripping, plant placement and haul distance as one connected system.

Days 5–6

Water and recovery

Diagnose water shortage and turbidity scenarios, then trace recovery losses through classification, sluice setup and cleanup.

Days 7–8

Keep it compliant

Build preventative maintenance discipline and complete a mock inspection with records, corrective actions and closure responsibilities.

Days 9–10

Run the business

Build a seasonal cash flow and break-even grade, then respond to a grade miss, a component failure and a water event in one final simulation.